![DL/T5210.4-2009电力建设施工质量验收及评价规程第4部分:热工仪表及控制装置(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/49/33689049/b_33689049.jpg)
4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_180.jpg?sign=1738987876-4tbEU5qpzpBtQScMEYh0E7ONNdWwSTNc-0-606e063359772704cbbcd2061e12d79d)
Table 4.6.2-1(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_181.jpg?sign=1738987876-6uGYeGb0VNCpSzcTUsHJgwA3OUdxkxwU-0-0ae0ee1dfd061710439aebbc5e76aac2)
2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_182.jpg?sign=1738987876-NMPGOzbMGMlz0zKeX6vDJEhlnZlhpdtr-0-61400f33b1f7e12bd467e093951ca1ec)
3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_183.jpg?sign=1738987876-k2RQIlNUyo5zgYzvpyjIRocrdRKlOD9p-0-5e70ed9a5004d773ad284100fefc40df)
4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_184.jpg?sign=1738987876-rMJNTf8APLdGZrizp8fRfXp3pzuMC0IE-0-e03dd7a9b527dfcd207a52d677f7afef)
Table 4.6.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_185.jpg?sign=1738987876-23GmCivqXqoM7rq13jgtS9DyMvUvreRm-0-d02e630feebc17ef00646c4cbdd3178f)
4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_186.jpg?sign=1738987876-aepJEQmOHvxUr5Y1vy5I2GFRGDikWdc2-0-08859e5f8e22e3e394fed51bed2593de)
2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_187.jpg?sign=1738987876-IE07DdjkwokgEVUCVBbKfUVQEkNyAC9q-0-7c0acb8a4516b1cebc0d88af7a6aa26f)
3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_188.jpg?sign=1738987876-dF6VeAlZ9NuUoUcuGlWPZZ3tS8xB9QSP-0-b587badf30d560b0bd208eb5ebb0fa4a)
4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_189.jpg?sign=1738987876-LVOzdhHArcMP3VOYwwFdHHYiDJSB4Wt2-0-5c8815fad0d215c221082f266c75af69)
5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_190.jpg?sign=1738987876-O3sRG1c84kGRzQG2VSZIUOodOExGxI0X-0-99d8e8fbdebc55397ad51608d74439b0)
6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_191.jpg?sign=1738987876-lXBpBRgxCopVuzZpXCplGXFy3nz2QO05-0-460daf471a18e5bea508d109327cb334)
7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_192.jpg?sign=1738987876-IRp1nl6jqLKmgWCHgN2wyAI8wTL8NWCc-0-803ceedfbcfa2619cb8884ee21cc3335)