8.6 Deoxidization Water Tank
Ⅰ Dominant Items
8.6.1 The hydrostatic test of deoxidization water tank shall comply with the requirement of the design technical document.
Quantity to be checked:100%.
Inspection method:Observe,and check the pressure test record.
Ⅱ General Items
8.6.2 The allowable deviation for installation of deoxidization water tank shall comply with the requirements in Table 8.6.2.
Quantity to be checked:100%.
Inspection method:See Table 8.6.2.
Table 8.6.2 Allowable deviation for installation of deoxidization water tank