6.5 Nitrogen Sealing Device
Ⅰ Dominant Items
6.5.1 The orifice of nitrogen sealing ring shall be unobstructed
Quantity to be checked:100%.
Inspection method:Observe.
Ⅱ General Items
6.5.2 The allowable deviation for installation of nitrogen sealing ring shall comply with the requirement in Table 6.5.2.
Quantity to be checked:100%.
Inspection method:See Table 6.5.2.
Table 6.5.2 Allowable deviation for installation of nitrogen sealing ring
![img](https://epubservercos.yuewen.com/5DC1A6/18000635001102306/epubprivate/OEBPS/Images/txt006_7.jpg?sign=1739375948-qotGLqn7tsmJziJf6NZ5bWv57utIfduh-0-0b6367486314b119722a3909986a4cd2)
Table 6.5.2(Continued)
![img](https://epubservercos.yuewen.com/5DC1A6/18000635001102306/epubprivate/OEBPS/Images/txt006_8.jpg?sign=1739375948-20XTTMQuGio9U2WosTKtJODtGvHJluhQ-0-200f738ebe7d467ece830ba2f4edb727)