GB50690-2011石油化工非金属管道工程施工质量验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

According to the requirements of Document Jian Biao[2007]No.126 issued by Ministry of Construction(MOC)-"Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2007(the Second),this code is formulated by Shengli Petroleum and Chemical Construction Corporation in collaboration with relevant organizations.

During the process,a monographic study and wide investigation was made by the preparation group to sum up practical experience in acceptance of non-metallic piping engineering in petrochemical engineering.Under the guideline of"split acceptance from evaluation,intensify acceptance,improve means and control process",solicited wide opinions from relevant organizations and experts as design,construction and supervision in different ways,this code was not finalized until it was examined and some key issues were revised repeatedly.

This code comprises 10 chapters.The main technical contents of this code are:General Provisions,Terms,Acceptance,Storage and Handling of Piping Components,Fabrication of Piping,Erection,Assembly,Examination of Piping Joints,Piping System Test,Piping System Purging and Cleaning Inspection,Technical Documentation of Construction Completion.

The provisions printed in bold type are compulsory ones and must be enforced strictly.

Ministry of Housing and Urban-Rural Development and General Administration of Quality Supervision is in charge of the administration of this code and the explanation of the compulsory provisions.Sinopec is responsible for the routine management,while Shengli Pertrochemical Construction Corporation reserves the rights to the interpretation of specific technical contents.All organizations are kindly requested to sum up and accumulate your experiences in actual practices during the process of implementing this code.The relevant opinions and advice,whenever necessary,can be posted or reflected to Shengli Petroleum and Chemical Construction Corporation(No.324 XiSi Road,Dongying,Shandong Province,Zip:257064,Email:tangriguang.slyt@sinopec.com)for the reference of future revision.

Chief development organization,the participating organizations,chief drafting staff and main auditing staff of this code are:

Chief Development Organization:

      Shengli Oilfield Shengli Petroleum and Chemical Construction Corporation

Participating Organization:

      Sinopec Tenth Construction Company

      Sinopec Nanjing Engineering& Construction Inc.

Chief drafting staff:

      Jiang Junrong Tang Riguang Liu Dong Duan Xiufang Jiang Guoxian

      Wang Guangchao Cheng Kezhong

Main auditing staff:

      Shu Zhijun Ge Chunyu Chen Yongliang Zhang Guihong Wang Zhizhong

      Meng Desu Shang Yaru Xue Jiuliang Cai Guoxiong Li Yi Du Zonglan

      Jiang Kuishu