GB 50372-2006 炼铁机械设备工程安装验收规范 (英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6.8 Furnace Top Guard Shield

Ⅰ General Items

6.8.1 The fixing method for furnace top guard shield shall meet the requirements in the design documents.

Check quantity:10% random check for guard shields.

Check method:visual check.

6.8.2 The allowable installation deviation of top guard shield shall meet the requirements in the Table 6.8.2.

Check quantity:20% random check for guard shields.

Check method:see Table 6.8.2.

Table 6.8.2 Allowable installation deviation of top guard shield(mm)